Startseite > Unternehmensnews

Kontakt

  • Room 11608, Unit 1, Building C, Door of Metropolis, Tangyan South Road, New Area of High-tech District, Xi'an City, Shaanxi Province, China

  • +86-29-89305761

  • +86-29-89305769

  • brightway@brightwaysolids.com

Fällen

Unternehmensnews

Delivery of 500GPM HDD Mud Recycling Systems

2026-08-20

Brightway Energy has finished the full assembly, joint commissioning and factory inspection of two 500GPM HDD Mud Recycling Systems, which have been officially loaded and delivered to the customer. The equipment will serve the customer’s trenchless underground cable laying project, providing a complete closed-loop mud treatment solution for HDD construction.

mud recovery system

Customized for on-site working conditions, the systems perfectly fit the HDD construction demands of underground cable laying. Integrated with core purification equipment including shale shakers, desanders & desilters and jet mud hoppers, the systems work collaboratively to perform multi-stage screening and purification of construction waste mud. They gradually separate drill cuttings, sediment and other solid impurities from mud, restore mud performance effectively and enable sustainable mud recycling.

mud recovery system

This HDD mud recycling system greatly cuts on-site mud material consumption and reduces waste mud outward disposal volume. It balances construction efficiency and environmental compliance to boost the efficient implementation of underground cable laying projects. Brightway Energy will follow up on subsequent project progress and provide professional technical support to ensure stable equipment operation.

mud recovery system

Focusing on the trenchless engineering field, Brightway Energy offers customized one-stop mud treatment solutions for various HDD scenarios including cable laying and pipeline crossing. Combining actual drilling rig parameters and geological conditions, our services cover equipment selection, system customization and on-site technical support, helping diverse HDD projects reduce costs, improve efficiency and realize green construction.

Vorherige :2000HP Cluster Well Solids Control System Successfully Shipped

Feedback-Formular

* Ihr Name:
* E-Mail:
* Firma:
* Fax:
* Telefonnummer:
* Nachricht: